|
|
 |
 |
R&D System |
|
We are investing 15% of our annual sales into our R&D lab., developing for instrument and technical updating, that's a commitment most other makers can't match. All this research has paid off. Meanwhile, our professional design makes company getting a name and many profits. We are currently carrying out reliability tests on new products.
Creation is HAL¡¦s soul by a marketing product developing system with powerful engineer team and management combining with professional laboratory and development center. |
 |
Development Center |
 |
|
Machinery
| 1. |
High-Speed Machining Center |
| |
Function: Working flat, sphere and
whorl for metals and nonmetals. |
| 2. |
Wire Cut Electric Digital Control
Machine Tool |
| |
Function: Working irregular shape,
cutting interior angle for stainless
steel, chilled steel, strong alloy,
copper, aluminum and so on. |
| 3. |
Die Sinking Electro-discharge Machine |
| |
Function: It can work thick-thin one time. |
| 4. |
Lathe |
| |
Function: It can work for turning, boring and machining of metric, inch,
moduel and diametral threads, as well as drilling, cutting, hinging. |
| 5. |
Milling Machine |
| |
Function: Mill or drill all kinds of material. |
| 6. |
Surface Grinder |
| |
Function: Grind or pare the surface of
metals. |
| 7. |
Hand Folder |
| |
Function: Fold up an iron plates which
is thinner than 2mm or soft metals
thinner than 5mm. |
Sample
Handmade series
| ¡EWorking the long SS1 case |
|
 |
¡EHandmade sample of SS1 base
& cover |
|
 |
¡EHandmade sample of SS1 base
& cover |
|
| ¡EWorking up cover of C1 case |
|
 |
|
 |
|
Mould series
Electrode series
|
|
|
¡ERemote control handle
electrode of game machine |
|
|
 |
EMI Testing |
 |
|
We have a very skilled quality control team to solve problems and provide customer service. We have our own laboratory facilities to carry-out reliability testing and have passed ISO17025 approvals. We also employ team of safety testers to assure our products conform with safety standards.
Procedures
Incoming material must be inspected by IQC. In process, every line has one IPQC to make production inspections, including first product inspection. We perform final inspection according to FQC. On outgoing products, we perform inspection according to OQC.
Testing Item
Safety Test
| Input Test |
High Temperature & Low Temperature Test |
| Temperature Test |
Insulation Impedance Test |
| Over Load Test |
Screw Torque Test |
| Leakage-Current Test |
Needle Flame Test |
| Dielectric Voltage-Withstand Test |
Ground Impedance Test |
| Working Voltage Test |
Tracking Test |
Reliability Test
* Climate Environment Test
| Safety Testing Item |
The Range |
The Standard |
| Vibration Test |
The Level¡BThe Vertical¡BThe Sine¡B
The Random¡BThe Sine + The Random |
GB/T2423.10 I |
IEC 60068-2-6 |
| Packing depreciation |
Most high loading¡G0-100Kg /
Biggest sample size1000*800*100¡]mm¡^ |
GB/T2423.8 |
IEC 60068-2-32 |
* Mechanical environment test
| Safety Testing Item |
The Range |
The Standard |
| High Temperature Test |
Room temperature ~ 300¢J |
GB2423.2 |
IEC60068-2-2 |
| Low Temperature Test |
Room temperature ~ -40¢J |
GB2423.1 |
IEC 60068-2-1 |
| Temperature & Humidity Test |
20¢J ~ 95¢J¡A20 ~ 98%RH |
GB/T2423.3 |
IEC 60068-2-3 |
| Temperature & Humidity Cycle Test |
-40¢J ~ 150¢J¡A20 ~ 98%RH |
GB/T2423.4 |
IEC 60068-2-30 |
| Temperature Cycle Test |
-40¢J ~ 150¢J |
GB/T2423.22 |
IEC 60068-2-14 |
| Salt Spay Test |
Neutral salt mist |
GB/T2423.17 |
IEC 60068-2-11 |
| Ball Pressure Test |
|
|
|
| Flameproof |
|
|
|
|
 |
|
|